1.
Zahtjev za priključenje na elektro mrežu (original)
ili
Lična karta (Obična kopija)
In case of a natural person.
2.
Rješenje o registraciji PIB (original)
In case of a legal person.
In case a new structure is being built, following documents are required:
1.
Urbanističko tehnički uslovi (2 original)
It has to be accompanied by a map of a detailed urban plan in a digital (CD) and a paper form, with routs of infrastructural networks and roads as well as guidelines and requirements for construction of infrastructure and building facilities.
2.
Revidovan glavni projekat (original)
In case a power supply is needed for a construction site, following documents are needed:
1.
Građevinska dozvola (original)
2.
Glavni projekat (original)
3.
Odobrenje priključenja na elektro mrežu (original)
For temporary structures, following documents are needed:
1.
Odobrenje lokacije privremenog objekta (original)
2.
Glavni projekat struje (original)
In case a change in supplied power is needed, following documents are needed:
1.
Odobrenje priključenja na elektro mrežu (original)
2.
Dokaz o izmirenim obavezama (original)
3.
List nepokretnosti (original)
4.
Glavni projekat struje (original)
Vrijeme čekanja u redu:
Min. 5mn
- Max. 10mn
Zadržavanje na šalteru:
Min. 5mn
- Max. 10mn
Vrijeme čekanja do narednog koraka:
Min. 15 dani
- Max. 120 dani
1.
Zakon o energetici
Članak 176
2.
Pravilnik o funkcionisanju distributivnog sistema el energije
Članak 40
Dodatne informacije